Gold Index: 4352
Xuzhou Lianfa Steel Structure Project Co., Ltd. [China (Mainland)]
Business Type:Manufacturer City: Xuzhou Province/State: Jiangsu Country/Region: China (Mainland)
Flat space frame canopy
1) Size:35X18M2) Glass Roof
2013-03-12
space frame for coal storage shed
1) Span:115m & 118m Height: 48.675m Foundation height: 3.0m2) Anti-rust treatment: expoxy zinc rich primer + PU finish
2013-01-16
Space Frame cement warehouse
1) Size: W148 x 125 Eaves x H11 M Project area: 18500M2 Volume of steel: 928T2) Color steel sheet: 12mm FRP Light Panel
Steel Structure Space Frame Constructions
1) Size: L3,000 x H15 M Building Area: 45,000 M2 Steel capacity: 675T2) Construction period: 100 days (2006.5_2006.8)
Pipe Truss Steel Structures
Span: 42 MLength: 200 MBuilding Area: 8,400 M2Steel capacity: 280 T
space frame for stadium
1) Size: D110 x H26 M Construction area: 8200 M2 Volume of Steel: 520T2) Project Duration:100 days (2007.3_2007.6)
power plant conveying trestle space frame
1) Size: L1080 x W3.0 x H2.4 M Project Area: 3240 M2 Volume of Steel: 648T2) Project Duration: 120 Days
steel structure for stadiums
1) Size: D80 x H3.5M Project Area: 5000M2 Volume of Steel: 280 T2) Project Duration: 50 days
space frame cement plant storages
1) Type: Bolted ball joint Space Frame2) Size: D87 x H42 M Projected Area: 5942M2 Volume of Steel: 290T
coal storage yard- thermal power plants
Size: D120 x H 53 MProjected Area: 11304 M2Volume of Steel: 550T
2013-03-07
Space Frame Coal Storages
Size: D120 x H71 MProjected Area: 11000M2Volume of Steel: 660TEnvelope board: 0.6mmColor Steel Sheet 1.2mmFRP Light Panel
Thermal Power Plant Coal Storage
1) Projected Area: 8170M22) Volume of Steel: 420T
Cement Plant Space Frames
1) Size: L130 x W60 x H30 M Projected Area:7800 M2 Volume of Steel: 425T2) Project Duration:70 days (2004.7_2004.9)
cement warehouse space frame
1) Size: L380 x W72 x H30.5 M Projected Area: 27744M2 Volume of Steel: 870T2) Project Duration: 210 days (2002.5_2002.12)
space frame coal yard storages
1) Size: L130 x W88 x H35M Project Area: 11440M2 Volume of Steel: 582T2) Project Duration: 120 Days
Steel Structure for Warehouses
.Light weight steel structure.Higher reliability of steel work